Specification & Codes

Complete Karnak U.L. & F.M. Approved Systems Listing

Company Index




A : B : C : D : E : F : G : H : I : J : K : L : M : N : O : P : Q : R : S : T : U : V : W : X : Y : Z

Company Deck
Type
Membrane
Manufact.
System INC. Surfacing
Coating
U.L.
Class
W P Hickman
Systems Inc.
Solon, OH.
NC Hickman Insulation: Perlite, WF, GF
Base Sheet: Type G-2
Membrane: Pika-Ply SA-4
1/2" #97
(1 to 2 gal/sq)
A
  C-15/32 Hickman Base Sheet: 2 Plies Type G-2
Membrane: Pika-Ply SA-4
Membrane: Pika-Ply SA-4
1/4" #97
(1 to 2 gal/sq)
A
  NC Hickman Insulation: (Optional) Perlite, WF, GF, ISO, ISO/Perlite Composite
Base Sheet: Type G-2
Membrane: Pika-Ply SS-4, SS-3P
1" #97 or #97AF
(1-1/2 gal/sq)
A
  C-15/32 Hickman Barrier Board: Water Resist. GYP 1/2"
Insulation: (Optional) Perlite, WF, GF,
ISO, ISO/Perlite Composite
Base Sheet: Type G-2
Membrane: Pika-Ply SS-4, MS-4, SS-3P
1" #97 or #97AF
(1-1/2 gal/sq)
A
  NC Hickman Base Sheet: (Optional) Type G-2
Membrane: Pika-Ply SS-4, SS-3P
1" #97 or #97AF
(1-1/2 gal/sq)
A
  C-15/32 Hickman Base Sheet: 2 Plies Type G-2
Membrane: Pika-Ply SS-4, SS-3P
1/4" #97 or #97AF
(2 gal/sq)
A
  C-15/32 Hickman Insulation: ISO, ISO/Perlite Composite
Base Sheet: Type G-2
Membrane: Pika-Ply SS-4, MS-4, SS-3P
1/2" #97 or #97AF
(2 gal/sq)
A
  NC Hickman Insulation: 1/2""Perlite Mop Type3 Aspht.
Base Sheet: 2 or more Type G-1 mopperd
Membrane: Pika-Ply 808 mopped
1/4" #97 or #97AF
(2 gal/sq)
A
  C-15/32 Hickman Insulation: Glas Fiber 1/2"
Base Sheet: Type G-2
Membrane: Pika-Ply SA-4
1/4" #97
(2 gal/sq)
B
  C-15/32 Hickman Insulation: Glas Fiber 1/2"
Base Sheet: Type G-2
Membrane: Pika-Ply SS-4, MS-4, SS-3P
1/4" #97 or #97AF
(2 gal/sq)
B
  C-15/32 Hickman Insulation: AC Foam II 1.2"
Base Sheet: 1 or mor plies Type G-2
Membrane: Pika-Ply SS-4, SS-3P
1/2" #97 or #97AF
(1-1/2-2gal/sq)
B
  C-15/32 Hickman Insulation: ISO 1.2"
Insulation: WF, GF, Perlite 1/2" min
Membrane: Pika-Ply SS-4, MS-4
1" #97 or #97AF
(1-1/2-2gal/sq)
B

Translate Site

Kanopy Reflective Roof Maintenance Solutions
  • Reduce Energy Use
  • Lowers Peak Energy Use, reducing energy costs year-round
  • Helps the environment, reduces "Heat Island Effect"
  • Extend the life of the roof
  • Reduces waste. Helps avoid roof tear-off.
  • Economic compared to roof replacement
  • Eliminates interior building operation disruption